Electrical engineer :
1、The whole process of new equipment scheme review (from layout to equipment delivery), output equipment software FAT/LOP checklist and other documents to ensure that new equipment meets design requirements (reliability, maintainability, product safety/quality);
2、Promote the assembly, commissioning and capacity climbing of the new cable according to the project plan to ensure that the new equipment meets the mass production requirements;
3、Support the software improvement of process capability, production efficiency, excellent rate, energy consumption and manufacturing cost of existing cable pulling equipment;
4、Implement technical standard formulation and audit of equipment PLC program and robot system;
5、Perform the audit of key equipment changes, and provide change control and technical support for the site;
6、Perform the audit of electrical related AM/PM form formulation and update;
7、Perform the confirmation of risky spare parts list and update of electrical related equipment.
Mechanical engineer :
1、The whole process of new equipment scheme review (from layout to equipment delivery), output equipment software FAT/LOP checklist and other documents to ensure that the new equipment meets the design requirements (reliability, maintainability, product safety/quality)
2、Promote the assembly, commissioning and capacity climbing of the new cable according to the project plan to ensure that the new equipment meets the mass production requirements
3、Support the software improvement of process capability, production efficiency, excellent rate, energy consumption and manufacturing cost of existing cable pulling equipment;
4、Implement technical standard formulation and audit of equipment structure and components;
5、Perform the audit of key equipment changes, and provide change control and technical support for the site;
6、Perform the audit of formulating and updating AM/PM forms related to machinery;
7、Perform the confirmation of risk spare parts list and update of machinery related equipment.